Civil / Site Works 

  • Clearing and grubbing the area is approximately 10 ha.
  • Surface water management, soil erosion and sediment controls as required.
  • Clearing and grubbing of the site.
  • Construction of compacted embankment (filling of excavated area) with material from approved borrow pit.
  • Supply and Installation of HDPE fire water line, and all deep underground utilities.
  • Supply and installation of landscaping materials.
  • Supply and install all geo-fabrics and geo-cell products as shown on the construction drawings.
  • Supply storm water and surface drainage control devices.

 

Construction Dates: Start Date: July 2018 

Completion Date: November 2018