St. Albert Asphalt Overlay

  • Specialty Services

Asphalt and Concrete surface demolition, bulk excavation, drainage replacement and realignment and site grading.

Trans Mountain Expansion

  • Industrial

Site grading, bulk excavation, access road construction and underground utility construction.

Inter Pipeline - PX5 Pipeline Cleanup

  • Industrial

Site grading, reclamation work, drainage improvements and final grading.

Adrossan Elementary K-6 School

  • Specialty Services

Site stripping, excavation, onsite/offsite utility construction, detail excavation/backfill, slab preparation and final grading.

River Cree Crossing Phase 1

  • Specialty Services

SDC's executed all earthworks, utilities and fuelling tanks for this projects. This included site stripping, earthworks, onsite and off site utilities, installation of the fuel storage tanks, detail excavation/backfill and final site grading.

St. Albert Fuel Station

  • Industrial

SDC's executed all earthworks, utilities and fuelling tanks for this projects. This included site stripping, earthworks, onsite and off site utilities, installation of the fuel storage tanks, detail excavation/backfill and final site grading.

Blatchford Redevelopment - Phase 1

  • Specialty Services

Surface asphalt and concrete demolition, as well as bulk excavation.

Yellowhead Trail Rehabilitation Program

  • Specialty Services

Site stripping, excavation, onsite/offsite utility construction, detail excavation/backfill, slab preparation and final grading.

Constable Daniel Woodall School

  • Specialty Services

Site stripping, excavation, onsite/offsite utility construction, detail excavation/backfill, slab preparation and final grading.

Londonderry Mall Expansion - Phase 2

  • Specialty Services

Selective Demolition, asphalt & concrete removal, excavation, utility removal and replacement, detailed under slab excavation, site grading and paving

Edmonton Transit

  • Specialty Services

Asphalt and Concrete surface demolition, bulk excavation, drainage replacement & realignment and site grading.

No Frills - McConachie

  • Specialty Services

SDC Services scope of work consisted of earthworks and underground utilities, including water, storm and sanitary sewer lines.

Cold Lake Service Centre

  • Specialty Services

Site grading, 20,000m3 excavation, underground utilities, directional drilling and fueling station.

Garland Pond Drainage Improvements

  • Infrastructure

As prime contractor, SDC was responsible to perform all tasks on site, development and manage all environmental and safety controls, as well as reporting and turn-over.

Cure Site Drainage Improvements

  • Infrastructure

As prime contractor, SDC was responsible to perform all tasks on site, development and manage all environmental and safety controls, as well as reporting and turn-over.

Beaumont Snow Dump

  • Infrastructure

Strip a 5 acre site, bulk excavation and fill to balance the site, install geotextile and grid throughout, excavate the storm pond, install non-permeable welded liner, final grad and commission.

Whitemud Widening

  • Infrastructure

This project consisted of asphalt and concrete surface demolition and removal, removal and replacement of underground utilities, bulk excavation and final grading.

NERP

  • Infrastructure

Each year consisted of road and sidewalk surface demolition and removal, bulk excavation, storm and sewer drainage installation and final grading. Roughly ten blocks were completed each year.

Symphony Tower

  • Infrastructure

Site stripping, 30,000m3 bulk excavation and removal, detail excavation/backfill and onsite/offsite underground utilities.

Ellerslie Industrial

  • Infrastructure

Site stripping, earthworks, onsite & offsite underground utilities, detail excavation/backfill and final grading

York Reality

  • Infrastructure

Site stripping, earthworks, onsite & offsite underground utilities, detail excavation/backfill and final grading

Sherwood Park Freeway

  • Infrastructure

Surface demolition and removal, earthworks and underground utility construction

Grovenor Tower

  • Infrastructure

Site striping, 10,000m3 excavation, detailed excavation & backfill, utility installation and backfill.

Joey's Restaurant

  • Infrastructure

Surface Demolition, site grading, underground utility installation and final grading.

Pinnacle Pipe and Heavy Haul Ltd

  • Industrial

Earthworks and site grading

Imperial Oil

  • Industrial

Surface demolition, site grading, drainage diversion & utility installation and final grading.

Sangudo Pump Station

  • Industrial

Clearing and grubbing, site stripping, earthworks, lease pad construction and final grading for the new pump station. This 5 acre site was located in Northern Alberta, key partnerships with local contractors and suppliers was developed to ensure the success of this project.

Bethel Way

  • Infrastructure

Site stripping, earthworks, underground utilities and final grading for the extension of Bethel and Bison Way in Sherwood Park.

Qualico Commercial Facility

  • Infrastructure

Excavation and Site Grading

Canexus Corporation

  • Industrial

Install, test, chlorination and commission of 3km 250mm pressurised water line

Central Water

  • Infrastructure

Excavation, backfill and onsite utilities - Five acre site.

Tanks Direct

  • Infrastructure

Excavation, backfill and onsite utilities - Three acre site.

Northwest Business Park

  • Infrastructure

Excavation, backfill and onsite utilities - Ten acre site.

Cameron Valves

  • Infrastructure

5 acre site development, detailed excavation and backfill, under slab preparation, onsite and off site utilities.

Edgemont Estates

  • Infrastructure

SDC Services scope of work consisted of earthworks and underground utilities, including water, storm and sanitary sewer lines. This work was in compliance with City of Edmonton Design and Construction Standards. SDC was responsible to tie-in to the existing City of Edmonton utilities, pressure test, CCTV and as-built the final product. This project was completed in 22 working days, ensuring the developer maintained their completion schedule.

Paisley Stage 7B

  • Specialty Services

SDC Services scope of work consisted of servicing a 26 lot subdivision, including water, storm and sanitary sewer lines. This work was in compliance with City of Edmonton Design and Construction Standards. SDC was responsible to tie-in to the existing City of Edmonton utilities, install frost box protection on lot services, pressure test, CCTV and as-built the final product. This project was completed in 14 working days, ensuring the developer maintained their completion schedule.

The Hendrix Tower

  • Infrastructure

SDC Services scope of work consisted of staged bulk excavation, detailed excavation, under-slab granular, surface demolition and removals, underground utility upgrades, mechanical excavation and weeping tile of a three story parkade located down town in Edmonton. SDC Services was engaged early in the pre-construction phase, from developing an execution strategy, to coordinating site activities between excavation and shoring.

The Brewery District

  • Infrastructure

As The Brewery District Commercial Re-Development project is LEED accredited project, our team was responsible to complete our scope of work in accordance with LEED NC&CS Prerequisite #1 requirements (Construction Activity Pollution Prevention). This included cattle gates for trucking, erosion control, controlled idle time on all equipment, re-use of underground mechanical systems, onsite aggregate reproduction and way bill tracking for landfill reduction impacts.

North East Transit Garage

  • Infrastructure

The Northeast Transit Garage consists of a 24 acre site development. SDC Services was hired to execute all earthworks, utility removals and deep utility construction. This included re-directing storm sewer lines to facility the new building, installing a new drainage system for on-site dewatering, and new potable water system

Coquitlam Water Plateau System

  • Infrastructure

SDC Services Scope of work consisted of the supply and installation of 2km of fused HDPE piping as well as high pressure DR 18 water line installation in the City of Coquitlam. This included open cut and directional drilling construction, traffic accommodations, insulation of concrete vault structures, pressure testing and commissioning.

Elk Island Nation Park

  • Infrastructure

SDC Services scope consisted of the supply and installation of two major pump stations with all associated distribution lines, including repairs and tie-ins of the existing utilities for the EINP infrastructure. Included in this scope was site stripping, excavation, placement of pre-cast concrete vault structures, locating and repairing existing lines, directional drilling, park traffic accommodation, pond de-sludge work, road re-construction and final grading. 

Paul Band Pump Station

  • Specialty Services

SDC Services scope of work consisted of earthworks and underground utilities, including water, storm and sanitary sewer lines. This work was in compliance with City of Edmonton Design and Construction Standards. SDC was responsible to tie-in existing pressurized utilities, pressure test, CCTV and as-built the final product.

Inter Pipeline Polaris Creek

  • Industrial

SDC Services scope of constructing access roads, lease pads, underground storage tanks, foundation excavation and backfill, pipeline installation, right-of-way construction and reclamation. This work was located on JACOS Canada brownfield site.

Heartland Petrochemical Complex

  • Industrial

This Scope of work includes HDPE Water distribution pipeline scope of the Inter Pipeline Propylene Ltd. (IPPL) PDH project. The core of the IPPL PDH Project is a Propane Dehydrogenation (PDH) Unit to be located in the vicinity of Redwater, AB on a new site approximately 3km south of the existing ROF/RFS facilities, (Redwater Olefins Fractionation facility, owned by IPPL, and Redwater Fractionation and Storage facility, owned by Pembina), on the east side of the North Saskatchewan river. The scope includes 50 and 100 mm diameter HDPE water distribution pipe including all fittings and valves approximately 600 m long.  A water supply cistern, including all pumps and treatment processes is included and designed by other

Pembina Pipelines
Namao Junction Terminal

  • Industrial

SDC Services scope of site stripping, clearing and grubbing, access road construction, lease pad construction, underground storage tanks, foundation excavation and backfill, pipeline installation, right-of-way construction and reclamation.  This work was located in Namao, Pembina site.